Before You Begin
Confirm the site is clean, clear and ready for installation. Flooring, paint, electrical and data rough-ins should be complete, and the installation drawings should be on site and approved.
Tools Required
- Cordless drill/driver with Phillips and hex bits
- 4 ft level and tape measure
- Rubber mallet and adjustable wrench
- Utility knife and floor protection
Receiving and Staging
Check delivered cartons against the packing list. Stage components by workstation location so parts are close to where they will be installed, and keep hardware bags with their matching components.
Assembly Sequence
- Lay out and mark workstation locations from the installation drawing.
- Install base frames, legs or panels and adjust levelers so every frame is level and square.
- Attach worksurfaces with the supplied fasteners; do not overtighten into laminate or wood cores.
- Install screens, storage, power and cable management components.
- Connect power and data harnesses per the electrical plan; final connections must be made by a licensed electrician where required.
Final Inspection
Check that all surfaces are level, drawers and doors operate smoothly, and all fasteners are secure. Clean surfaces, remove packaging debris and walk the installation with the site contact before sign-off.